On this page
- Key facts
- What do examiners ask about marine electrical systems at each rank?
- What electrical numbers and rules must you know for the oral?
- How do you recover from a blackout?
- How do you synchronise and parallel a generator?
- Which generator protection devices do examiners ask about?
- How should you structure an electrical answer in the oral?
- What mistakes do candidates make on electrical topics?
- Which electrical situations do examiners give you?
- How do you calculate load sharing between generators of different sizes?
- How do you fault-find electrical faults step by step in the oral?
- What should you read to revise marine electrical systems?
- How can you practise electrical answers before the oral?
- 35 practice questions
- Frequently asked questions
- Sources
Key facts
- Main rules
- SOLAS Ch. II-1 Part D, Regs 40 to 45
- Emergency supply on cargo ships
- 18 hours for listed services[1]
- Emergency generator
- Services supplied within 45 s of main power failure[1]
- Transitional battery
- At least half an hour[1]
- Emergency generator starting
- Starts at 0 °C; 3 starts stored plus 3 more within 30 min[2]
- UMS standby generator
- Auto start and connect within 45 s[3]
- Generator governor (IACS UR M3)
- Transient ±10% frequency, recovery 5 s; permanent ±5%[4]
- High voltage
- Over 1,000 V needs the HV course on UK CoCs[5]
- Examined at
- MEO Class 4, 2, 1 (Function 5); MCA EOOW, Second, Chief; ETO
Checked 14 November 2026. Fees and rules change: confirm with the authority before you book.
What do examiners ask about marine electrical systems at each rank?
Electrical questions sit in STCW Function 5, electrical, electronic and control engineering. The MEO Class 4 oral includes Electrical, Electronic and Control Engineering among its four functions[6], and Indian orals need at least 60 percent to pass[7]. UK engineer CoCs carry the same function[5], examined in the MCA EOOW oral, the Second Engineer oral and the Chief Engineer oral. ETO candidates go deepest; see the ETO CoC exam. Read about STCW functions if the term is new.
| Exam | Level | What they usually probe |
|---|---|---|
| India MEO Class 4 | Operational (III/1) | Generator paralleling, synchroscope, blackout recovery, earth lamps, motor starters, batteries, emergency generator test, safe isolation |
| India MEO Class 2 | Management, second engineer | Protection (reverse power, preferential trips, under-voltage), load sharing, AVR and governor faults, HV safety, insulation trending |
| India MEO Class 1 | Management, chief engineer | SOLAS Part D rules, dead-ship start, survey of electrical installations, blackout risk management, HV permits, shore power |
| MCA EOOW | Operational | Scenarios: blackout on watch, earth fault alarm, starting and paralleling a generator, taking shore power |
| MCA Second Engineer | Management | Generator protection, switchboard maintenance, fault-finding motors and starters, battery and emergency systems |
| MCA Chief Engineer | Management | Compliance, HV safety management, risk assessment of electrical work, blackout investigations |
What electrical numbers and rules must you know for the oral?
SOLAS Chapter II-1 Part D (Regulations 40 to 45) sets the main and emergency power rules. Class rules such as IACS UR M3 and M31 add performance figures. Learn these together; examiners often ask "which regulation" after you give the number.
| Item | Requirement | Where |
|---|---|---|
| Main source | At least two generating sets; with any one stopped the rest supply services for normal operation and safety | SOLAS II-1 Reg. 41 |
| Emergency source, cargo ship | Supplies emergency lighting and listed services for 18 hours[1] | SOLAS II-1 Reg. 43 |
| Emergency generator | Starts automatically and services are supplied within 45 s[1] | SOLAS II-1 Reg. 43 |
| Transitional source | Battery supplies its services for at least half an hour[1] | SOLAS II-1 Reg. 43 |
| Emergency generator starting | Ready start at 0 °C; stored energy for 3 consecutive starts plus a second source for 3 more within 30 min[2] | SOLAS II-1 Reg. 44 |
| Emergency generator fuel | Flash point not less than 43 °C allowed[8] | SOLAS II-2 Reg. 4.2.1 |
| UMS standby generator | Automatic start and connection within 45 s when one generator supplies the load[3] | SOLAS II-1 Reg. 53; IACS UR M31 |
| Generator governing | Transient frequency within ±10%, recovery within 5 s; permanent speed variation within ±5%[4] | IACS UR M3 |
| Earth fault | Insulated systems need a device that continuously monitors insulation level and gives an alarm or indication | SOLAS II-1 Reg. 45 |
| High voltage | UK CoC without HV course not valid on ships with systems over 1,000 V[5] | MCA certification rules |
How do you recover from a blackout?
Blackout recovery is the most common electrical scenario in every engine oral. Speak in order: safety of the ship first, then power, then propulsion, then the cause. The exact sequence depends on the ship's power management system; this is the general principle.
- 1Inform and confirm
Inform the bridge and the chief engineer. Confirm the emergency generator has started and the emergency switchboard is live (steering, emergency lighting, emergency fire pump available). The main engine will have stopped or will stop.
- 2Find why it blacked out
Look at the alarm list and generator breaker trip indications before resetting anything. Was it overload, a generator trip (low lube oil pressure, overspeed, high water temperature), a short circuit, fuel starvation or a reverse power trip?
- 3Start a healthy generator
If the standby generator did not start automatically, start one that is not faulty, check it runs at rated voltage and frequency, and close its breaker on to the dead main switchboard.
- 4Restore essential services in steps
Restart steering gear pumps, then lube oil, cooling water and fuel pumps for the main engine, then compressors, in sequence to avoid a second overload; non-essential loads shed by preferential trips come back last. Start a second generator and parallel it as soon as possible.
- 5Prepare the main engine
Check main engine lube oil and cooling are back, fuel at the right temperature, starting air pressure enough, turning gear out. Tell the bridge when the engine is ready.
- 6Restore the emergency switchboard
When the main switchboard is live, the emergency switchboard transfers back (interconnector closes) and the emergency generator is stopped after its cool-down run, then set back to automatic.
- 7Record and investigate
Log times and actions, investigate the root cause, report under the safety management system and correct it before relying on the plant again.
How do you synchronise and parallel a generator?
Four conditions must match before you close an incoming generator breaker: voltage, frequency, phase sequence and phase angle. Phase sequence is fixed at installation and checked after any cable work; the other three you adjust each time.
- Voltage: set the incoming machine to bus voltage with the AVR trim.
- Frequency: run the incoming set slightly fast so the synchroscope turns slowly clockwise (fast direction); the machine then picks up a little load as soon as it closes instead of motoring.
- Phase angle: close the breaker just before the pointer reaches 12 o'clock so the contacts meet in phase. Synchronising lamps (dark or bright lamp method) are the back-up.
- Load sharing: after closing, raise the incoming set's governor setting and lower the other's until kW is shared in proportion to ratings. Reactive load (kVAr) is shared by the AVRs; check ammeters and power factor are balanced.
Wrong synchronising gives a heavy current surge, mechanical shock to couplings and can trip both machines. That ties into the auxiliary diesel engines topic, where governor and engine faults are covered.
Which generator protection devices do examiners ask about?
Know what each device protects against and what happens when it acts.
| Protection | What it prevents | Notes for the oral |
|---|---|---|
| Overcurrent (inverse time) | Overheating from sustained overload | Time delay longer at small overload, shorter at large |
| Short circuit (instantaneous) | Damage from fault currents | Breaker trips fast; discrimination so the nearest breaker trips first |
| Reverse power | A generator being driven as a motor by the others when its engine loses power | Trips the motoring set's breaker; setting and time delay from maker and class |
| Under-voltage | Closing on to a dead or low bus unintentionally; motors stalling | Under-voltage release also stops the breaker closing without voltage |
| Preferential trips | Blackout on overload | Shed non-essential loads (galley, air conditioning, cargo services) in stages so essential services stay on |
| Earth fault monitoring | Undetected insulation breakdown | Insulated neutral: first fault gives alarm, second on another phase is a short circuit |
How should you structure an electrical answer in the oral?
Begin with safety and the immediate action, then the principle, then the fault-finding sequence.
- Safety: isolate, lock out, tag out and prove dead before touching anything. For HV, follow the permit and earthing procedure.
- Principle: one or two sentences of why (for example, why reverse power happens).
- Sequence: what you check, in order, with the instrument you use.
- Close: records, reporting and how you prevent a repeat.
Examiners often interrupt with "What if that does not work?", so keep a second action ready. Practise this with our mock oral drill and read what oral examiners look for.
What mistakes do candidates make on electrical topics?
- Closing the breaker with the synchroscope running slow, or at 6 o'clock, and saying "it will pull into step".
- Mixing up which control shares kW (governor) and which shares kVAr (AVR).
- Saying the emergency generator must start in 45 seconds. The rule is that the services must be supplied within 45 seconds.
- Forgetting that the emergency generator can start at 0 °C and has a second starting source.
- Saying an earth fault on an insulated system trips the breaker immediately.
- Testing insulation without disconnecting electronics, or without discharging the circuit after the test.
- Talking about high-voltage work without permit, isolation, proving dead and applying earths.
More patterns are in why seafarers fail oral exams.
Which electrical situations do examiners give you?
- Blackout while the ship is manoeuvring in port. Expect follow-ups on steering power and the emergency generator.
- Earth fault alarm on the 440 V board at night in UMS mode. How you find the circuit without blacking out the ship.
- One generator tripped on reverse power while two were in parallel. What caused it and how you restart safely.
- Emergency generator did not start during the weekly test. What you check and what you tell the master.
- Ship arriving in dry dock needs shore power. Phase sequence, voltage, frequency and interlocks.
- Battery room alarm and smell of gas. Ventilation, no ignition sources, hydrogen risk.
For wider emergencies see emergency procedures. Alarm handling in unattended machinery spaces is covered in UMS and automation, and electrical supply to the steering motors in steering gear.
How do you calculate load sharing between generators of different sizes?
With the same percentage droop on each governor, generators share active load in proportion to their ratings. Different droop settings, or different speed settings, move load from one set to another. Work it out from the droop lines.
Worked example (example figures). A 600 kW set and a 400 kW set run in parallel on a 60 Hz bus, both with 4% droop. Both have been trimmed so that each would reach rated load at 60 Hz, so each has a no-load setting of 62.4 Hz (4% of 60 Hz = 2.4 Hz above). The ship's load is 700 kW.
- Each set's load = rating × (62.4 − f) ÷ 2.4.
- Total = (600 + 400) × (62.4 − f) ÷ 2.4 = 700, so 62.4 − f = 1.68 and f = 60.72 Hz.
- 600 kW set: 600 × 1.68 ÷ 2.4 = 420 kW (70%). 400 kW set: 400 × 1.68 ÷ 2.4 = 280 kW (70%).
- Check: 420 + 280 = 700 kW. Both sets are at the same percentage of their rating, which is what proportional sharing means.
Now change one setting. Raise the 400 kW set's no-load setting to 62.6 Hz, leaving the other alone. Then 600 × (62.4 − f) + 400 × (62.6 − f) = 700 × 2.4 = 1,680, so 37,440 + 25,040 − 1,000f = 1,680 and f = 60.80 Hz. The 600 kW set now takes 600 × 1.60 ÷ 2.4 = 400 kW (67%) and the 400 kW set takes 400 × 1.80 ÷ 2.4 = 300 kW (75%). Total 700 kW.
The lesson for the oral: raising one governor's setting shifts load onto that set and raises the bus frequency a little; you then lower both together to bring frequency back. Class rules limit how far each set may stray from its proportional share in parallel[9]. Reactive load (kVAr) does not move with the governor at all; it is shared through the AVRs, so check that the ammeters and power factor meters agree as well as the kW meters.
How do you fault-find electrical faults step by step in the oral?
Keep essential services running, isolate safely, then prove the fault with instruments: never work on a circuit you have not proved dead. These walk-throughs follow the order examiners expect.
Walk-through 1: earth fault alarm on the 440 V switchboard
Symptom. The insulation monitor alarms, or one earth lamp goes dim while the other two glow brighter.
Checks in order.
- Note which phase the lamps show and the insulation monitor reading; tell the chief engineer and the electrician.
- Ask the bridge before you interrupt anything that affects navigation, cargo or steering.
- Switch off non-essential feeders one at a time and watch the monitor. When the reading recovers, you have found the feeder.
- Follow that feeder down to its distribution board and repeat for each outgoing circuit.
- When the circuit is found, isolate, lock and tag it, prove it dead, then megger the cable and equipment separately to find which is faulty.
Likely cause. Water in a deck junction box or motor terminal box, damaged cable insulation, or a failed heater element.
Action. Dry out or repair; re-test insulation before re-energising.
Report. Log the fault, the circuit and the repair; update the insulation record.
Examiner's note: The trap is "one earth fault is harmless on an insulated system". Panels want to hear that a second earth on another phase is a short circuit, and that essential circuits such as steering are not switched off without the bridge's agreement.
Walk-through 2: a generator breaker will not close
Symptom. The incoming generator is running, synchronised, but the breaker will not close when you press close.
Checks in order.
- Is the breaker spring charged? Many air circuit breakers need the closing spring charged by motor or by hand.
- Is the under-voltage release energised? With no voltage from the incoming machine, the UV release blocks closing.
- Is a trip still latched (overcurrent, reverse power, earth fault)? Reset only after you know why it tripped.
- Is the synchronising check relay blocking closure because the phase angle or frequency is outside its window?
- Is the breaker fully racked in and its control supply available?
Likely cause. Uncharged spring, no voltage at the UV coil (AVR or excitation fault), a latched trip or the check relay.
Action. Fix the cause; do not force the breaker closed manually against the check relay.
Report. Log.
Examiner's note: Candidates rarely mention the under-voltage release. Panels see it as proof that you understand breaker protection, not just the start button.
What should you read to revise marine electrical systems?
- Practical Marine Electrical Knowledge by Dennis T. Hall: clear on switchboards, protection and fault-finding.
- Marine Electrical Practice by G.O. Watson: deeper on design and installation.
- Reed's Vol 6: Basic Electrotechnology for Marine Engineers and Reed's Vol 7: Advanced Electrotechnology for Marine Engineers by Christopher Hughes: theory for written and oral.
- SOLAS Consolidated Edition, Chapter II-1 Part D (Regs 40 to 45) and Part E (Reg. 53).
- IACS Unified Requirements M3 and M31, and your ship's power management manual.
Test yourself with the marine electrical MCQ set and the CES engine practice set. Our books for MEO Class 4 list puts these in a reading order.
How can you practise electrical answers before the oral?
Say the blackout and synchronising answers aloud until you can do them in under two minutes each. Use the oral readiness check to find weak topics, follow the 30-day oral preparation plan, and pack using the oral exam day checklist. Our AI voice examiner in early access asks the follow-up questions a real panel would. Electrical questions also appear in company marine engineer interview questions and the CES test for engineers. The MEO Class 4 vs Class 2 comparison shows how the depth rises, and the MEO Class 2 oral and MEO Class 1 oral pages explain the management-level papers.
Oral practice
35 oral questions with model answers
Read the question, answer it out loud as if the examiner is across the table, then open the model answer and mark yourself honestly.
- 1
Describe the main electrical distribution system on a typical cargo ship.
Model answer points
- Diesel generators (and sometimes a shaft generator) feed the main switchboard through air circuit breakers.
- Typical three-phase AC, three-wire, insulated neutral at the generator voltage, for example 440 V 60 Hz, or high voltage on large ships.
- Main switchboard feeds large motors directly and section boards and distribution boards for smaller loads.
- Transformers step down to 220 V (or 110 V) for lighting and small power.
- Emergency switchboard fed from the main board through an interconnector, and from the emergency generator when the main supply fails.
- At least two generating sets so that with one stopped the rest can supply services for normal operation and safety.
The examiner may follow up with- Why is 60 Hz common on ships?
- What is an interconnector breaker?
How did you do? - 2
Why is an insulated neutral system used on most ships?
Model answer points
- A single earth fault does not create a fault current path, so the circuit keeps running.
- Essential services such as steering and fuel pumps are not lost because of one fault.
- The fault is shown by earth lamps or an insulation monitoring device so it can be found.
- A second earth fault on a different phase becomes a phase-to-phase short circuit and trips the breaker.
- Earthed neutral systems are used on some ships and on HV, with earth fault protection that trips or alarms.
The examiner may follow up with- What is the danger of leaving an earth fault uncleared?
How did you do? - 3
How do earth lamps show an earth fault?
Model answer points
- Three lamps are connected in star between each phase and the hull (earth).
- With healthy insulation they glow equally dim.
- An earth fault on one phase short-circuits that lamp, so it goes dark (or dim) and the other two get brighter.
- Modern ships use an insulation monitoring device showing resistance in ohms and giving an alarm.
- SOLAS requires a means to continuously monitor insulation and give an alarm or indication in insulated systems.
The examiner may follow up with- What does a partially dim lamp tell you?
How did you do? - 4
Walk me through starting and paralleling a second generator.
Model answer points
- Pre-start checks: lube oil level, cooling water, fuel, turning gear out, air for starting, no work in progress.
- Start the engine, check oil pressure, temperatures and that it runs at rated speed.
- Check incoming voltage and adjust with the AVR trim to match the bus.
- Switch on the synchroscope; adjust the governor so it turns slowly in the fast direction.
- Close the breaker just before the pointer reaches 12 o'clock.
- Share kW with the governors and check kVAr and current are balanced.
- Switch off the synchroscope; record.
The examiner may follow up with- What happens if you close at 6 o'clock?
- Why run the incoming set slightly fast?
How did you do? - 5
How do you share load between generators in parallel?
Model answer points
- Real power (kW) is shared by the engine governors. Raise the fuel setting (speed setting) of the set you want to take more load and lower the other.
- Reactive power (kVAr) is shared by the AVRs through the excitation.
- Check kW meters, ammeters and power factor meters are balanced in proportion to ratings.
- Governor droop settings must match for stable sharing.
- Power management systems do this automatically, but you must know the manual method.
The examiner may follow up with- What happens if one AVR fails and over-excites?
How did you do? - 6
What is reverse power and what protects against it?
Model answer points
- In parallel, if one generator's engine loses power (fuel starvation, governor fault), the generator takes power from the bus and runs as a motor.
- The other sets carry the extra load and may overload; the engine may be damaged.
- The reverse power relay senses power flowing into the generator and trips its breaker after a short time delay.
- Setting and delay are set by maker and class, so the relay does not trip on momentary swings during synchronising.
- After a trip, find the engine cause before paralleling again.
The examiner may follow up with- Why is a time delay needed?
How did you do? - 7
What are preferential trips and why are they fitted?
Model answer points
- An overload relay on the generator trips selected non-essential loads in stages when the generator is overloaded.
- First stage: for example air conditioning, galley, laundry; second stage: other non-essential loads.
- Keeps essential services (steering, propulsion auxiliaries, navigation, fire pumps) running.
- Prevents a blackout while a standby generator starts.
- Test as per the planned maintenance system.
The examiner may follow up with- Which loads would you never put on a preferential trip?
How did you do? - 8
The ship blacks out at sea. What do you do, and what comes back first?
Model answer points
- Inform the bridge and chief engineer. First back is the emergency generator, feeding the emergency switchboard within 45 s (emergency lighting, steering gear supply, navigation lights, radio, fire detection); confirm it.
- Check the alarm list and breaker trip flags to find the cause before resetting.
- Start a healthy generator (if standby did not start) and close on to the dead board.
- Restart essential auxiliaries in sequence (most restart automatically through the sequential restart): steering gear, lube oil, cooling water, fuel, then compressors; loads shed by preferential trips come back last.
- Parallel a second generator.
- Prepare and restart the main engine when the bridge needs it.
- Restore the emergency board to normal, put the emergency generator back on auto.
- Log, investigate and report.
The examiner may follow up with- What would cause the standby generator not to start automatically?
- What is a dead-ship condition?
How did you do? - 9
What does SOLAS require of the emergency source of power on a cargo ship?
Model answer points
- A self-contained source (generator or battery) above the uppermost continuous deck, outside machinery casings, with its own switchboard.
- Supplies emergency lighting and other listed services (navigation lights, radio, fire detection, emergency fire pump, steering where required) for 18 hours.
- If a generator: starts automatically and its services are supplied within 45 seconds.
- If it cannot meet that, a transitional battery supplies the essential services for at least half an hour.
- The emergency switchboard is fed from the main switchboard in normal operation.
The examiner may follow up with- Name the services fed for 18 hours.
- Why must it be above the uppermost continuous deck?
How did you do? - 10
What are the starting requirements for an emergency generator?
Model answer points
- Must start readily in cold condition at 0 °C; heating if lower temperatures are expected.
- Automatically started sets: stored energy for at least three consecutive starts.
- A second source of energy for three further starts within 30 minutes, unless manual starting is shown to be effective.
- Stored energy kept charged at all times, from the emergency switchboard (electric or hydraulic) or through a non-return valve from the main air system.
- Starting, charging and storage devices located in the emergency generator space.
The examiner may follow up with- What second starting means have you seen?
How did you do? - 11
How do you test the emergency generator?
Model answer points
- Check fuel tank level, lube oil, coolant, battery or air pressure and that it is set to automatic.
- Simulate main power failure (for example using the test switch that de-energises the emergency board supply) so it starts automatically and the breaker closes on to the emergency board.
- Check voltage, frequency and that emergency services are supplied within 45 s.
- Run on load for the time set in the PMS, then restore normal supply and let it cool down before stopping.
- Also test starting from the second (back-up) source periodically.
- Record in the log and PMS.
The examiner may follow up with- Why test on load and not only on no load?
How did you do? - 12
How do you take shore power safely?
Model answer points
- Confirm shore supply voltage and frequency match the ship's system, and the capacity is enough for the load you will run.
- Connect cables at the shore connection box with ship's generators still running; check the phase sequence indicator.
- Shed load and open generator breakers (interlocks usually stop shore and generator breakers being closed together unless designed for transfer).
- Close the shore power breaker on to the dead board and restart essential loads.
- Watch current and earth fault indication; keep a generator ready.
- Log the changeover.
The examiner may follow up with- What happens if phase sequence is wrong?
How did you do? - 13
How do you measure insulation resistance of a motor?
Model answer points
- Isolate, lock out, tag and prove dead.
- Disconnect electronic components (drives, AVR cards) that the test voltage could damage.
- Use an insulation tester at the voltage suited to the equipment rating.
- Test each phase winding to earth and between phases.
- Discharge the winding after the test.
- Compare with previous readings and the maker or class minimum; a falling trend matters more than one reading. Readings drop when hot or damp.
The examiner may follow up with- How would you dry out a damp motor?
How did you do? - 14
What safety precautions do you take before working on electrical equipment?
Model answer points
- Permit to work where required by the SMS.
- Isolate at the breaker, lock out and tag out with your own lock.
- Prove dead with an approved tester, checking the tester before and after.
- Watch for back-feeds and stored energy (capacitors, space heaters, control supplies from another source).
- Use insulated tools and PPE; never work alone on live gear.
- For HV: HV permit, isolation, proving dead, applying earths, a competent authorised person.
The examiner may follow up with- Where can a back-feed come from on a motor starter?
How did you do? - 15
How does an air circuit breaker protect a generator?
Model answer points
- Main contacts carry current; arcing contacts and arc chutes break the arc when opening.
- Spring-charged closing mechanism (motor or hand charged), trip coil and under-voltage release.
- Trip unit gives overcurrent (inverse time), short circuit (instantaneous or short delay) and sometimes earth fault protection.
- Reverse power and other relays trip it through the shunt trip coil.
- Under-voltage release stops it closing on to a dead bus unless arranged for dead-bus closing, and trips on voltage loss.
- Maintenance: contacts, arc chutes, mechanism, trip tests by secondary injection.
The examiner may follow up with- What is discrimination in protection?
How did you do? - 16
What happens if you close a generator breaker out of phase?
Model answer points
- The voltage difference drives a very large circulating current between the machines.
- Huge torque pulls the incoming machine into step, shocking couplings, shafts and engine.
- Breakers may trip, possibly causing a blackout.
- Windings and connections can be damaged by the forces.
- That is why close just before 12 o'clock with the synchroscope turning slowly, and check sync lamps or a check-synchroniser relay.
The examiner may follow up with- What is a check synchroniser?
How did you do? - 17
What is the function of the AVR and what happens when it fails?
Model answer points
- The AVR senses terminal voltage and adjusts field excitation to keep voltage constant as load and power factor change.
- Brushless generators: AVR feeds the exciter field; rotating diodes rectify for the main field.
- Failure low: voltage falls, the set takes little kVAr, others overload with reactive current; under-voltage trips possible.
- Failure high: over-voltage on a single set, or in parallel high reactive current circulating; over-current trips.
- Diode failure in the rotating rectifier gives voltage dips or failure to build up.
The examiner may follow up with- Why might a generator fail to build up voltage after overhaul?
How did you do? - 18
Explain the governing requirements for generator engines.
Model answer points
- Governor must hold frequency so transient variation on the maximum step load is within ±10% of rated, with recovery to steady state within 5 seconds.
- Permanent speed variation between no load and full load within ±5% of rated speed.
- The engine should accept load in steps (for example 50% then the remaining 50%) without tripping.
- A separate overspeed device trips the engine before dangerous overspeed.
- Droop must be similar on all sets for stable parallel sharing.
The examiner may follow up with- What is isochronous governing?
How did you do? - 19
An earth fault alarm appears on the 440 V board at night. How do you find the fault?
Model answer points
- Note the reading on the insulation monitor and check that it is real (not a monitor fault).
- Check recent changes: equipment started, wash-down, rain on deck, leaks.
- Isolate non-essential circuits one at a time and watch the reading; inform the bridge before switching anything that affects navigation or steering.
- Use changeover to a standby unit to test essential circuits without losing the service.
- When the reading recovers, isolate that circuit and test it with an insulation tester down to the faulty item.
- Repair, dry out or replace; record.
The examiner may follow up with- Why is speed important with a known earth fault?
How did you do? - 20
What is single phasing in a three-phase motor, and what protects against it?
Model answer points
- Loss of one phase (blown fuse, loose connection, contactor fault).
- A running motor keeps running on two phases but draws much higher current and overheats.
- A stopped motor will not start; it hums and overheats.
- Protection: thermal overload relays with phase-loss sensitivity, or electronic motor protection relays.
- Steering gear motors give an alarm for phase failure rather than tripping.
The examiner may follow up with- How would you find a blown fuse on a starter?
How did you do? - 21
Compare direct-on-line and star-delta starting.
Model answer points
- DOL: full voltage applied; starting current several times full-load current; simple, used for small and medium motors where the generator can take the dip.
- Star-delta: start in star (each winding at line voltage divided by root 3), so starting current and torque fall to about one third, then change to delta.
- Star-delta reduces voltage dip on the switchboard for large pumps and compressors.
- Other methods: auto-transformer, soft starters, variable frequency drives.
- Protection: overload relays, short-circuit fuses or breakers, under-voltage release.
The examiner may follow up with- Why must star-delta changeover be timed correctly?
How did you do? - 22
What are the hazards of the battery room, and what precautions apply?
Model answer points
- Lead-acid batteries give off hydrogen when charging, which is explosive in air.
- Good ventilation to the open air; no naked lights, smoking or sparking tools.
- Electrolyte is corrosive: goggles, gloves, eyewash.
- Keep lead-acid and nickel-cadmium batteries and their tools separate.
- Check electrolyte level and specific gravity (lead-acid) or voltage, terminals clean and greased.
- Emergency and transitional batteries are tested as per PMS and SMS.
The examiner may follow up with- Why must lead-acid and Ni-Cd batteries not share tools?
How did you do? - 23
What is a dead-ship condition and how do you recover from it?
Model answer points
- The main propulsion plant, boilers and auxiliaries are not working because there is no power, and no stored energy is available for starting the main plant.
- SOLAS requires means to bring machinery back from dead ship without outside help.
- Typically: emergency generator supplies the emergency board, which can run an emergency air compressor or feed power to start a main generator.
- Then the main generator restores the main board and auxiliaries in sequence.
- Tested during commissioning and as required by the SMS.
The examiner may follow up with- What feeds the emergency air compressor?
How did you do? - 24
What are the main safety rules for high-voltage systems on board?
Model answer points
- Only authorised and trained persons; on UK CoCs the HV course is needed for ships with systems over 1,000 V.
- Written safety programme: permit to work, switching plan, sanction for test.
- Isolate, lock, prove dead with an HV tester, and apply circuit main earths before work.
- Keep safe distances; use HV gloves, mats and tools rated for the voltage.
- Insulation testing uses higher test voltages; discharge after testing.
- Earthed neutral through a resistor is common on HV with earth fault protection.
The examiner may follow up with- Why are HV systems often earthed through a resistor?
How did you do? - 25
What is a shaft generator and what extra checks does it need?
Model answer points
- A generator driven from the main engine (directly or via gearing) to save fuel at sea.
- Frequency follows engine speed, so it needs a constant-speed drive (CP propeller at fixed speed) or a frequency converter.
- Usually not paralleled with diesel generators unless designed for it; changeover is planned.
- Loss of main engine speed means loss of the shaft generator, so the standby must start automatically.
- Checks: converter cooling, synchronous condenser if fitted, load limits during manoeuvring.
The examiner may follow up with- Why is the shaft generator disconnected during manoeuvring on many ships?
How did you do? - 26
What periodic electrical surveys and tests does the chief engineer plan?
Model answer points
- Emergency generator, emergency lighting and transitional battery tests.
- Insulation resistance records of generators, switchboards and main motors.
- Generator protection tests (reverse power, overcurrent, under-voltage) by secondary injection, often by a specialist.
- Preferential trip and standby start tests.
- Thermographic survey of switchboards to find hot connections.
- HV equipment maintenance by authorised persons; class survey of the electrical installation.
The examiner may follow up with- What does a thermographic survey find?
How did you do? - 27
Why can a generator trip on reverse power soon after you parallel it?
Model answer points
- It was closed slow (synchroscope turning anticlockwise), so it took power from the bus.
- Governor set too low after closing, so the incoming set does not pick up load.
- Load reduced suddenly so the lightly loaded set motors.
- Engine fault: fuel filter choked, fuel rack sticking.
- Correct by closing slightly fast and raising its governor setting promptly.
The examiner may follow up with- How does a power management system avoid this?
How did you do? - 28
A 600 kW and a 400 kW generator run in parallel, both with the same percentage droop and correct settings. The ship's load is 700 kW. How is the load shared, and how would you move load from one to the other?
Model answer points
- With equal percentage droop and matched settings, sets share active load in proportion to their ratings.
- Total rating 1,000 kW, load 700 kW, so each set runs at 70%: 420 kW on the 600 kW set and 280 kW on the 400 kW set.
- To move load onto a set, raise its governor speed setting; to move load off, lower it. Total load does not change; bus frequency shifts a little.
- Then trim both together to bring frequency back to rated.
- Reactive load (kVAr) is shared by the AVRs, not the governors; check ammeters and power factor too.
- Each set must stay within the class limit on deviation from its proportional share in parallel.
The examiner may follow up with- What happens if one set is isochronous and the other on droop?
- How do you know reactive load is shared badly?
How did you do? - 29
Can you close the emergency generator in parallel with the main generators for testing?
Model answer points
- Normally no. The emergency switchboard is fed from the main board, and the emergency generator is arranged to supply the emergency board only when the main supply fails.
- Interlocks usually stop the emergency generator breaker closing while the interconnector is closed.
- Some ships allow short-time parallel transfer by design; follow the maker's arrangement.
- Test it by simulating main supply failure, not by paralleling.
The examiner may follow up with- What can the emergency generator supply besides emergency services?
How did you do? - 30
Must the emergency generator start within 45 seconds?
Model answer points
- The rule is that the services it feeds are supplied within 45 seconds of main power failure, with the generator starting automatically and connecting to the emergency switchboard.
- So starting, coming up to speed and the breaker closing all fit inside 45 seconds.
- If not arranged to do that, a transitional battery source supplies the key services for at least half an hour.
- Do not confuse with the 45 s steering alternative power supply.
The examiner may follow up with- Which services does the transitional source supply?
How did you do? - 31
An earth fault on one phase of a 440 V insulated system: is it dangerous if everything keeps running?
Model answer points
- Yes. The system is now effectively earthed through the fault.
- A second earth fault on another phase is a short circuit that trips a breaker, possibly an essential service.
- The healthy phases now sit at higher voltage to earth, stressing insulation.
- Anyone touching a healthy phase and earth gets a more dangerous shock path.
- Find and clear it quickly.
The examiner may follow up with- How do you trace it without a blackout?
How did you do? - 32
Will a generator share kVAr if you only adjust the governor?
Model answer points
- No. The governor controls the engine fuel and so the kW share.
- Reactive load (kVAr) depends on excitation, controlled by the AVR.
- Unequal ammeter readings with equal kW mean unequal kVAr sharing, an AVR or droop problem.
- Fix with AVR trim or by correcting the AVR fault, not the governor.
The examiner may follow up with- What is quadrature droop compensation?
How did you do? - 33
During insulation testing you get a very low reading on a pump motor. Do you condemn the motor?
Model answer points
- Not straight away. Check the test: is the cable disconnected from the starter? Is moisture or dirt in the terminal box?
- Test the motor and cable separately to locate the low part.
- Damp windings can be dried out with space heaters, warm air or low-voltage current, watching the reading rise.
- Then trend the value; if it does not recover, rewind or replace.
The examiner may follow up with- Why does a hot motor read lower than a cold one?
How did you do? - 34
Can you take shore power without checking phase sequence if voltage and frequency match?
Model answer points
- No. Wrong phase sequence makes every three-phase motor run in reverse.
- Pumps, fans and compressors may be damaged or deliver nothing; steering gear may run the wrong way.
- The shore connection box has a phase sequence indicator; check it every time cables are connected.
- Swap two phases at the shore end if it is wrong.
The examiner may follow up with- Which machinery is most at risk if it runs in reverse?
How did you do? - 35
The emergency generator runs on the same heavy fuel as the main generators to save cost. Is that acceptable?
Model answer points
- No. The emergency generator must have its own independent fuel supply so it works when the main plant has failed.
- It must start readily from cold at 0 °C, which heavy fuel needing heating cannot meet.
- It normally uses distillate fuel; a flash point of not less than 43 °C is allowed for emergency generators.
- Keep its tank level and fuel quality checked.
The examiner may follow up with- Where must the emergency generator fuel tank be located?
How did you do?
Reading answers is not the same as saying them. Our AI voice examiner asks these out loud, listens to your answer, asks the follow-up and marks you against the rule. Join early access or try the free timed mock oral drill.
Frequently asked questions
How long must the emergency generator supply power on a cargo ship?
On cargo ships the emergency source must supply emergency lighting and the other listed services for 18 hours. Passenger ships have a longer period. This is SOLAS Chapter II-1 Regulation 43.
How fast must the emergency generator take load?
If the emergency generator starts automatically, it must be connected so that its services are supplied within 45 seconds of the main power failing. If it cannot do that, a transitional battery source must supply the most important services for at least half an hour.
What are the four conditions for synchronising?
Equal voltage, equal frequency, the same phase sequence and the incoming machine in phase with the busbar at the moment of closing. In practice you run the incoming set slightly fast and close just before 12 o'clock on the synchroscope.
What is reverse power and why is it dangerous?
Reverse power happens when a generator in parallel loses its engine power, for example through fuel starvation, and is driven as a motor by the other sets. It loads the healthy sets and can damage the prime mover. The reverse power relay trips the motoring generator's breaker.
What are preferential trips?
Preferential trips shed non-essential loads in stages when a generator is overloaded. Loads like galley equipment, air conditioning and cargo services trip first so that propulsion, steering and safety services stay on. They help prevent a blackout.
Why do ships use an insulated neutral system?
With an insulated neutral, a single earth fault does not cause a large fault current or trip the supply, so essential services keep running. The earth fault is shown by the insulation monitor or earth lamps so it can be found and cleared. A second earth fault on another phase is a short circuit.
How do you find an earth fault on board?
Watch the insulation monitor or earth lamps while isolating circuits one at a time, starting with non-essential ones, with permission from the bridge for anything that affects navigation. When the reading recovers you have found the circuit. Then test that circuit's insulation with an insulation tester and repair it.
What does the AVR do in parallel operation?
The automatic voltage regulator controls excitation and so the generator voltage. In parallel operation the AVRs share the reactive load (kVAr) between generators. Real load (kW) is shared by the engine governors.
How is the emergency generator tested?
Under the ship's planned maintenance and SMS, test it by simulating main power failure so it starts automatically and takes load. Also test starting from the second source, check fuel level and the battery or air charging. Record the test.
What do I need to know about high voltage for the oral?
Know the permit to work, isolation, proving dead with an approved tester, applying earths and the safety roles. On UK CoCs, without the HV course a CoC is not valid on ships with systems over 1,000 V. Class 2 and Class 1 candidates are often asked about HV safety management.
Is electrical knowledge tested separately for ETOs?
Yes. Electro-technical officers sit their own CoC exam in India and the UK with much deeper electrical and electronic content. Marine engineers still need operational and management knowledge of the plant for their own orals.
Which book is best for marine electrical orals?
Practical Marine Electrical Knowledge by Dennis T. Hall is the most practical for orals. Reed's Vol 6 and Vol 7 cover the theory, and Marine Electrical Practice by G.O. Watson goes deeper. Pair them with SOLAS Chapter II-1 Part D.
Sources 9 documents
Each number in the text links to the source below. Labels show the type of source; see our editorial policy.
- Official Isle of Man SD 603/98 Merchant Shipping (Cargo Ship Construction) Regulations 1998, Schedule 10 (transposing SOLAS Ch. II-1 Reg. 43) · 1 January 1998
- Official Isle of Man SD 603/98 Merchant Shipping (Cargo Ship Construction) Regulations 1998, Schedule 10 Part 2 (transposing SOLAS Ch. II-1 Reg. 44) · 1 January 1998
- Reported Turk Loydu TL-R M (January 2023), reproducing IACS UR M29, M30 and M31 · 1 January 2023
- Reported Turk Loydu TL-R M (January 2023), reproducing IACS UR M3 Speed governor and overspeed protective device · 1 January 2023
- Official MSN 1857 (M+F) Amendment 1: UK requirements for engineer officers and engineer operators
- Official TEAP Manual Part A (Consolidated Rev. 1, 1 May 2015), Chapter III, Section III/1 para 6.5 · 1 May 2015
- Official TEAP Manual Part A (Consolidated Rev. 1, 1 May 2015), Chapter III, Section III/16 para 10 · 1 May 2015
- Official Cayman Islands Shipping Registry CIGN 10-2023 Rev 01 Off-specification fuels (quoting SOLAS II-2/4.2.1) · 1 January 2023
- Reported Turk Loydu TL-R M (January 2023), reproducing IACS UR M3.2 · 1 January 2023